To make sure your calendar, event reminders, and other features are always
correct, please tell us your time zone (and other details) using the
drop-down menus below:
Set Date/Time format:
In 12 Hour format the hours will be displayed as 1 through 12 with “a.m.” and “p.m.”
displayed after the time (ex. 1:00p.m.). In 24 hour format the hours will be displayed as 00 through 23 (ex. 13:00).
You can always change your time zone by going to your Account Settings.
Use the dropdown menu to view the events in another time zone. The primary time zone will be displayed in parentheses.
Use the dropdown menu to view the events in another time zone. The primary time zone will be displayed in parentheses.
Visiting Bruce Zhu(username: copperbusbarmachine)
Tag
Please wait...
Select a Color
Manage Applications
Check the items that you want displayed. Uncheck all to hide the section.
Calendars
Files
Addresses
To Dos
Discussions
Photos
Bookmarks
The “Switch Navigator” button will no longer be available after February 14, 2017.
Please learn more about how to use the new Navigator by clicking this link.
Which is the best of the copper row bus bending machine?
Which is the best of the copper row bus bending machine?
CNC bus processing machines are suitable for compound parts of processing periodic compound production. The market demand of some products is periodic and seasonality. The quantity is also difficult to ensure. After the first processing center of the processing center is selected, the program and related production information can be saved. The next time the product is produced, it only needs to be prepared to start production.
Which of the copper row bus bending machine is best because the transmission chain of the CNC bus equipment mostly uses rolling friction, so most of the faults in this area are caused by the decline in the quality of the movement. Requirements, mechanical crawling phenomena, bearing noise (especially after mechanical hard collision is easy to produce), etc. This part of maintenance is often closely related to the pre -tightening force of the movement of the movement, the adjustment of the loosening ring and the compensation link.
First of all, the quality of the power supply directly affects the controller of the bus. The core electrical control part of the busbar machine is the controller. The quality of the quality is particularly important. Due to the power supply equipment with heavy load, the general factory's power supply will cause the fluctuation and instability of the power grid voltage, which will cause the unstable and abnormal work of the controller. Therefore, precision electrical equipment Generally, special power supply is required, and conditional users can also distribute source stabilizers.
The machine tool is welded as a whole with carbon connecting board and is treated with high temperature recovery. The equipment has good steel, does not deform, has small vibration at work, and low noise. High processing accuracy and good stability. The components used are well -known brands at home and abroad, with long service life to ensure quality.
In this article, the copper row processing machine consists of three units: punching, bending, and shearing. It can complete the punching flowers, bending and shear processes of copper row. 120) mm, thickness (3 ~ 1mm copper steak, bending any angle within (90-180) °. Make sure the accuracy of the bending angle and the consistency of the same batch of copper rows are bending station stations The two very important indicators. Which is the best?
Qu Daokui: Seizing opportunities began to judge. Why is the robot's scenery unique? Because it is "good idea", this point is the turning point of the new round of industrial revolution. The market background corresponding to the first three industrial revolution is in short supply, and each revolution has brought out the outbreak of production capacity. However, by the fourth industrial revolution, the corresponding market environment was overcapacity, and the supply and demand relationship was reversed. What does excess mean? Wealth has more satisfied the basic needs of human beings. New demand no longer chase "quantity", but has a "quality" that has a variety of choices, fast updates, and uniqueness. If you create unsatisfactory manufacturing, the more batch and rigidity, the worse you die. Recently, Germany proposed industry 0, the United States proposed the Industrial Internet, Japan, etc. to propose Industry 2050, etc., in fact, they are all seizing the commanding heights of manufacturing transformation.
Which is the best anti -theft door equipment brand company for the copper row bus bending machine and adheres to the road of professionalism, technology, and continuously improve the ability of scientific and technological innovation. Continuous development and improvement of self. Yongkang's anti -theft door equipment has good quality and cost -effective price. It can not be used for a long time without any problems, and it is convenient to operate. People who do not need very professional people can operate.
The purpose of immersion: The main purpose of immersion paint is to prevent moisture. When the transformer coil and the iron core are moisture, the insulation of the coil will be reduced. After the power is powered, it is easy to break through and cause a short circuit of the coil. For transformers with fine wire diameter, Later, the coil may be broken, and the silicon steel sheet is also easy to rust. After the painting is treated, it can not only prevent moisture, but also increase the degree of heat resistance of the transformer. After the air gap and the air layer are filled with insulating substances, the heat dissipation properties can be improved. The heat resistance can be increased from 80 ° C ~ 85 ° C to 100 ° C ~ 105 ° C. After soaking the paint, it can also improve the mechanical strength of the coil.
Attach this document to an event, task, or address
You can attach a link to this document to an event in your Calendar, a task in your To Do list or an Address. Check the boxes below for the data you want to
bring into the event’s or task’s description, and then click “Select text to copy” to have the next event or task you create or edit have the document text and link.