To Do List

2 Gutters - clean and realign caulk joints check fascia for damage 250
3 repair door latch on front door and install weather stripping 150
4 adjust garage door 50 adjustment. If can’t be adjusted then replacement 350 each
5 Replace GFCI outlet and rear patio 125
8 HVAC inspection 200
9 The automatic shut off switch for the lower fan panel at furnace did not shut the system off repair 75
10 AC service part of 9
11 Toilet in main floor powder room need new wax ring and bolts tightened , the master bath toiled should be tightened 75
20 repair left window sash in master bedroom 100
shower door in master sticks- repair